What data are necessary for the preparation of  a  comprehensive  investment  project?
 
Having concluded a contract, our client’s duty is  to  provide  formal  input  data  (excluding those already submitted to us in the stage of prior consultation):
 
 
1. Documents for ownership of the land (title deed for the property on which we shall build)
 
2. Design visa (excerpt from the detailed development plan issued by the chief architect of the municipality or the region)
 
3.  Design  assignment  (final  specification  of the requirements concerning your  future house  on the  basis  of  preliminary consultation)
 
4. Geodetic survey of the terrain (for a sloping terrain, it is desirable to be submitted at the preliminary stage)
 
5. Geological and hydrological surveys of the terrain (if required by the municipality)
 
6. Preliminary contract to join the local electricity company (CEZ, E. ON, EVN, etc.).
 
7. Preliminary contract to join the local water company.
 
The purpose of these data is to submit the necessary information about the property to all  engineering  specialties.  The output  data are formed as Appendix 1 to the contract.