First stage - making a design

Начало » First stage - making a design
What is the timetable for drafting a design? 
 
After  approval  of  our  preliminary  offer,  you
should conclude a contract for design and construction of your future house.
 
 
For this purpose, the steps are:
 
1. Provision by the customer of output data for design (the aim is to submit the necessary information    about    the    property    to    all
engineering specialties)
 
2.  Development  of  a  conceptual  project  in Part   “Architecture”   (after   provision   of   all official output data, we will specify the final architecture of your future house)
 
3. Approval of a conceptual project in Part “Architecture” by the client (this project is particularly important because it is the basis for elaboration of all our further schemes in the process of creation of a comprehensive technical design of the house.
 
4. Approval of the list of construction and assembly works by the client (in this comprehensive  list  we  will  determine  the scope of the forthcoming construction)
 
5. Elaboration of a technical design (once we know exactly what you want, we can finish with a detailed elaboration)
 
6. Submission of a technical design for issuance  of building  permission (approximately   30   days   are   required   for review and approval of the design in the local community). The projects made by the company Sweet Home Bulgaria meet the requirements  of  the  Bulgarian  legislation  in the field of construction.
 
What does the design of the house contain? According to Article 137, paragraph 5 of the SPA, the houses are constructions of the fifth category. Hence, under Ordinance 4 of 2001 on  the  scope  and  content  of  investment projects, the following design parts are required in preparation of the technical design of a house:
 
* Part " Architecture "
* Part "Constructions"
* Part "Electric Power Supply and Installations”
* Part "Water Supply and Sewerage"
* Part "Thermal Efficiency"
* Part "HVAC” - heating, ventilation, air conditioning (if required by the municipality)
* Part "PSH" - plan for safety and health
* Part " Public Works and Landscaping" (if required by the municipality)
* Part " Geodetic" (if required by the municipality)